St Cleres School — Phase 2 — New teaching block, sports hall & kitchen

The brief

Following Phase 1, Thurrock Council appointed us to take St Clere’s School through a second phase: a new science teaching block with kitchen and dining provision, a new sports hall, and a new front entrance with offices for the Academy Trust.

Constraints

  • Live school site throughout a programme of March 2019 to December 2020
  • Planning delays and the arrival of Covid-19 during construction
  • Programme delays and additional cost associated with services connections
  • A main contractor who performed poorly in parts of the contract and changed managerial staff several times

Our role

Architectural design, project management and CDM under a JCT Design and Build contract, tendered through a framework on a two-stage basis. The teaching block and sports hall were built as a steel frame with off-site insulated panels; the entrance and remodelled areas in traditional masonry and timber frame. We committed substantial time to managing the contractor closely to bring the works to a satisfactory completion.

Outputs

  • Tender documentation and two-stage framework procurement
  • JCT Design and Build contract administration
  • Design review of the contractor’s proposals
  • Progress inspections, valuations and change control
  • CDM duties and Practical Completion

Result

High-quality new teaching, sports and dining facilities handed over for the school, with the trust’s offices in the reorganised main building — delivered despite the contractor and pandemic problems the project ran into.